ESA Chart II Final Production Tests

    Production Up To Encapsulation Stage
   
Para 9.1   Internal (pre-cap) Visual Inspection
   
Para 9.2.1   Bond Strength Test
   
Para 9.2.2   Die-Shear Test
   
Para 9.3   Encapsulation
   
Para 9.4   High Temperature Stabalisation Bake
   
Para 9.5.1   Thermal Shock
   
Para 9.6   Constant Acceleration
   
Para 9.7   Particle Impact Noise Detection (PIND) Test
   
Para 9.8.1/2   Seal Test Fine & Gross Leak (optional)
   
Para 9.9.3   Electrical Measurements at Room Temp
   
Para 9.9.2   Electrical Measurements at High and Low Temp (optional)
   
Para 4.4   Marking (and Serialisation for Level B)
   
Para 9.10   External Visual Inspection: AQL 1% ILII
   
Para 9.11   Dimension Check
   
    To Chart III